Small, medium or large you pick the site KTM has the equipment and operators to provide your rough grades, final grades with laser control accuracy, needed retaining walls, infrastructure placement of utilities etc.
KTM starts the process working closely with civil engineer and geotechnical engineer then by using state of the art software to evaluate the site for minimum amount of material movement and provide value engineering insuring the project gets started on time and under the most cost effective budget. All projects receive the necessary engineer stamps and approvals during the project to provide a sure start to the project.
Services include:
- National Pollutant Discharge Elimination System (NPDES) compliance
- Storm Water Pollution Prevention Plan (SWPPP)-Silt Fence, Wattles, Seeding, Erosion Control, Soil & Sediment Management, Surface Roughening, Concrete washout areas, etc
- Fugitive Dust Control
- Rough Grading
- Fine Grading
- Road cut in and road maintenance
- Retaining walls
- Septic Systems
- Grease traps

- Infrastructure utilities
- Site pads
- Foundations
- Basements
Replacing a grease trap


KTM working inside the walls of a home to level the floor. Compaction test showed 98%, 3% higher than required
KTM replaced the culvert and added concrete columns to protect culvert ends.
KTM laser level site pad +/- 1/4"



Site pre work for a barn in Chama NM



KTM moved over 13,000 yards of material to level 6 acres +/- 1/4" for new equestrian center


Rail Road tie retaining wall


Keystone retaining wall