KTM WWG is proud to be building a new home nestled in the quiet vistas that are unique to Northern New Mexico.  This ICF block home will have many energy efficient features, truely a unique green home.  Pictures will be added as progress continues.  Design, plans and all phases of construction provided by KTM, a self performing General Contractor.  FOR MORE PICTURES, PLEASE VISIT OUR BLOGS.

site staked  Geo Tech Services  SITE LAYOUT

KTM provides all phases of construction including site prep and soil engineering.  Congratulations to the homeowner for choosing a beautiful setting.

ground breaking              site layout

 

 laser leveling equipment             NEW DRIVEWAY                     

              Attention to detail from groundbreaking to laser leveling, KTM crews bring experience and a full array of equipment to your project.  Vehicles are parked only on future driveways and care is taken to disturb only the ground of the new home.

 versahandler       laser leveling        versahandler

 fire prevention     chipped wood   wood pile
   Tree removal only for wild fire prevention as required.  Wood is either chipped or cut to burn in wood stove.

auger for digging foundations  describe the image  P  644 General Goodman Cerrillos NM Media web pictures caisson 1

Geo tech and engineering studies called for 20' caisson foundations.  The concrete is pumped down 20' to prevent seperation.

describe the image  ICF block with framing  ICF block walls

ICF block walls provide insulating quiet and thermal mass for energy efficiency.  Windows and doors and framed in before concrete pour.